| Akron, Village of | Village Insulation Program | ERIE | Western New York | $134,516.61 | 98 | Installation of energy efficient insulation in 52 residents' homes. | Completed | 2012 | |
| Albany City Schools | Ph.V (ARRA) | ALBANY | Central | $6,088,978.52 | 1,900 | Includes the replacement of three boilers, installation of two 75KW combined heat and power units, replacement of the domestic hot water heater, optimization of chiller plant controls, upgrade of air handling units, upgrade of lighting, upgrade pool heating and ventilation system, and installation of a pool cover. | In Development | 2013 | |
| Amsterdam City Schools | Greater Amsterdam School District - Pool Heating | MONTGOMERY | Central | $444,932.13 | 132 | Installation of a new pool heating system, automatic pool cover, high efficiency boilers, solar thermal collectors and 6 KW photovoltaic solar array on the roof. | In Progress | 2013 | |
| Arcade, Village of | Village Insulation Program | WYOMING | Finger Lakes | $261,508.53 | 218 | Installation of energy efficient insulation in 117 residents' homes. | Completed | 2012 | |
| Bergen, Village of | Village Insulation Program | GENESEE | Finger Lakes | $36,148.25 | 30 | Installation of energy efficient insulation in 16 residents' homes. | Completed | 2012 | |
| Blenheim, Town of | Town of Blenheim | SCHOHARIE | Central | $51,736.41 | 11 | Installation of new heating coltrols and upgrades; upgrading of building insulation; installation of energy efficient lighting and 4.4KW Solar PV system. | In Development | 2013 | |
| BOCES | BOCES - Washington-Saratoga-Warren-Hamilton-Essex | SARATOGA | Central | $3,764,185.17 | 704 | Installation of new chiller, lighting and upgrade of building management system at Myers Building and new boilers, lighting and upgrade of building management system at Southern Adirondack Building. | In Progress | 2013 | |
| Boonville, Town of | Village Insulation Program | ONEIDA | Mohawk Valley | $25,496.00 | 21 | Municipal Commission of Boonville Electric System installed energy efficient insulation in 11 residents' homes. | Completed | 2012 | |
| Churchville, Village of | Village Insulation Program | MONROE | Finger Lakes | $15,635.60 | 13 | The village weatherized homes, saving approximately $200 per home. | Completed | 2012 | |
| Clinton CSD | Clinton Central School District | ONEIDA | Mohawk Valley | $3,750,552.36 | 875 | The installation of energy efficient lighting, HVAC upgrades, electric motor replacements, boiler replacements and hot water heater systems. | Completed | 2012 | |
| Corinth CSD | Corinth Central School District | SARATOGA | Central | $3,003,457.94 | 603 | Controls upgrades, boiler replacement, installation of a solar PV system, lighting upgrade, installation of occupancy and daylight sensors, installation of vending machine misers (equivalent of occupancy sensors) and weatherization. | In Development | 2013 | |
| Cortland, County of | Cortland County | CORTLAND | Central New York | $1,695,244.52 | 267 | Boiler replacements, chiller replacement and energy management system upgrades at the county office building and courthouse. | Completed | 2012 | |
| Endicott, VIllage of | Village Insulation Program | BROOME | Southern Tier | $32,620.00 | 27 | Customer-implemented program with the Village of Endicott Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 14 residents' homes. | Completed | 2012 | |
| Fairport, Village of | Village Insulation Program | MONROE | Finger Lakes | $296,200.00 | 243 | The installation of energy efficient insulation in 131 residents' homes. | Completed | 2012 | |
| Fonda Fultonville CSD | Fonda-Fultonville Central School District | MONTGOMERY | Central | $1,144,098.88 | 416 | Installation of energy efficient lighting, lighting controls, a pool cover, and 80 kW photovoltaic installation. | In Development | 2013 | |
| Greenburgh, Town of | Town of Greenburgh - Street Lighting Study (ARRA Funded) | WESTCHESTER | Southeastern | $155,792.00 | 7 | Evaluation LED technology as it relates to roadway lighting: identify three locations with different profiles, develop lighting models using LED fixtures. | In Progress | 2013 | |
| Groton, Village of | Village Insulation Program | TOMPKINS | Southern Tier | $80,612.00 | 66 | Customer-implemented program with the Village of Groton Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in two residents' homes. | Completed | 2012 | |
| Hamilton, Village of | Village Insulation Program | MADISON | Central New York | $114,731.00 | 94 | Customer-implemented program with the Village of Hamilton System. Customer partnered with the IEEP for the installation of energy efficient insulation in residents' homes. | Completed | 2012 | |
| Irvington UFSD | POCR Solar PV - Irvington School District | WESTCHESTER | Southeastern | $75,000.00 | 4 | Installation of 6kW solar photovoltaic system, Irvington High School/Middle School | Completed | 2013 | |
| Islip, Town of | Town of Islip - East Street Lighting Upgrade | SUFFOLK | Southeastern | $2,406,618.98 | 1,128 | Replacement of high pressure sodium, low pressure sodium and metal halide street lighting with more energy efficient induction based lighting technology. | In Progress | 2013 | |
| Islip, Town of | Town of Islip - LED Traffic Signals & Bldg ECMs | SUFFOLK | Southeastern | $1,915,156.85 | 1,236 | LED traffic signal upgrades, high efficiency lighting and occupancy sensor upgrades, upgrade boiler burners, energy management and control system upgrades, HVAC upgrades at 11 town facilities. | In Progress | 2013 | |
| Islip, Town of | Town of Islip - High Efficiency Street Lighting | SUFFOLK | Southeastern | $3,718,575.59 | 1,341 | Replacement of high pressure sodium, low pressure sodium and metal halide street lighting with more energy efficient induction based lighting technology. | In Progress | 2013 | |
| Lake Placid, Village of | Village Insulation Program | ESSEX | North Country | $275,579.00 | 226 | Customer-implemented program with the Village of Lake Placid, Inc. Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 121 residents' homes. | Completed | 2012 | Photos |
| Mayville, Village of | Village Insulation Program | CHAUTAUQUA | Western New York | $47,776.00 | 39 | Customer-implemented program with the Village of Mayville Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 21 residents' homes. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | Metro North - North White Plains - Ph.II Lighting | WESTCHESTER | Mid-Hudson | $585,952.65 | 351 | Upgrade of lighting system and installation of a new electric compressor. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | Metro North - Grand Central Terminal - Ph.I | NEW YORK | New York City | $1,512,868.00 | 796 | Phase I: Upgrade of lighting, replacement of motors, air compressors and installation of advanced metering. | Completed | 2012 | Photos |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Jerome Maintenance Yard - Compressor Upgrade | BRONX | New York City | $74,804.47 | 51 | Upgrade of compressed air system in building. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Jamaica Train Yard - HVAC and Windows | QUEENS | New York City | $318,626.05 | 62 | Installation of roof top central HVAC (heat pump system) and duct work, and replacement of inefficient windows with double-pane energy efficient windows. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Maspeth Warehouse Lighting & Occupancy Sensor Project | QUEENS | New York City | $248,757.27 | 239 | Upgrade of lighting and installation of occupancy sensors in the building. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Pelham Yard - Solar Thermal Hot Water | BRONX | New York City | $230,733.93 | 30 | Installation of boiler controls and more efficient domestic water heater. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - 207th Street Train Yard - Lighting | NEW YORK | New York City | $618,718.35 | 591 | Upgrade of lighting system. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Coney Island Yard - Wheel/Axle and Motor Shop Lighting | KINGS | New York City | $159,519.07 | 193 | Installation of energy efficient lighting. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Tunnel Series LED Lighting - Ph.I | NEW YORK | New York City | $417,823.00 | 405 | The replacement of existing 35-watt incandescent series lamps powered on 600V AC or DC with 10-watt LED Series bulbs. Approximately 5,000 units will be replaced in Phase I. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Tunnel Series LED Lighting - Ph. II | NEW YORK | New York City | $1,300,722.00 | 1,168 | The replacement of existing white and blue Panasonic 22-watt CFLs located along subway tunnel walls with a 10-watt LED bulb and replacement of existing 36-watt white and approximately 13 blue incandescent bulbs located in subway tunnel interior. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - 3rd Rail Heater Wireless Controls - Ph.II | KINGS | New York City | $2,552,081.00 | 3,498 | The installation of wireless RF controls to monitor, control third rail heating elements. | Completed | 2012 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Queens Village Bus Depot - Lighting | QUEENS | Southeastern | $277,124.00 | 251 | Replacement of HID with T5HO fixtures in maintenance and parking areas. | Completed | 2013 | |
| Metropolitan Transportation Authority (MTA) | Long Island Rail Road (LIRR) - Jamaica Headquarters Building - ASHRAE Audit | QUEENS | Southeastern | $100,000.00 | 0 | Energy Audit for entire building including HVAC, heating plant, roof, windows, and lighting. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | Long Island Rail Road (LIRR) - HVAC Upgrade Phase 2 - MTW Shop | QUEENS | Southeastern | $10,658,238.00 | 2,431 | Replacement of HVAC units and exhaust fans on the roof of the LIRR Hillside Maintenance Facility. Approximately 59 HVAC units will be replaced with 40 new, high efficiency units and approximately 107 exhaust fans will be replaced with 71 new, high efficiency units. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | Metro North - Grand Central Terminal - Ph.II | NEW YORK | Southeastern | $21,934,891.24 | 11,275 | Phase II: Pumps/ VFDs, BMS upgrade / AHUS, steam system repairs, air compressors, chiller plant replacement, cooling tower controls, metering | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | Metro North - Mt. Vernon Station - Electric Infrastructure for Regenerative Braking | WESTCHESTER | Southeastern | $42,894,929.00 | 9,201 | Installation of metering equipment and electric service improvements for Metro North Railroad to take advantage of regenerative braking at their Mount Vernon Bridge 23 Substation. Regenerative braking enables energy normally wasted during the braking process to be fed back into the electric supply system. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | Metro North - Grand Central Terminal - Standby Generators | NEW YORK | Southeastern | $16,915,985.00 | 0 | Installation of two 2,000KW standby generators for Grand Central Terminal, associated fuel storage tank, paralleling switchgear, distribution relays and controls, load banks, power transformers, and connection into existing SCADA system. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Flatbush Bus Depot Compressed Air System Replacement Project | KINGS | Southeastern | $414,279.23 | 113 | Compressed Air System Replacement | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Central Station Battery Energy Storage System - CI | NEW YORK | Southeastern | $175,282.00 | 0 | Installation of an advanced battery system and monitoring equipment at a central sub-station in Manhattan. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Castleton Bus Depot Compressed Air System Upgrade | RICHMOND | Southeastern | $238,854.51 | 91 | Compressed air system upgrade | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Coney Island Yard - Boiler Replacement | KINGS | Southeastern | $5,447,665.50 | 1,547 | Replace central boiler plant with energy efficient boiler. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Banker Lights | NEW YORK | Southeastern | $3,069,794.00 | 2,412 | Relpacement of existing incandescent banker lamp utilizing 5x 75-watt bulbs (or a total of 375-watts) with a new 85 watt LED banker lamp; approximately 4000 units will be replaced. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Rail Car Oil-Less Compressor | KINGS | Southeastern | $16,506,835.00 | 2,720 | Furnish and deliver energy efficient oil-less air compressors for MTA R46 and R68 rail cars, to replace the existing compressors. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Gun Hill Bus Depot - Lighting | BRONX | Southeastern | $475,924.00 | 318 | Installation of energy efficient lighting. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Site I-Hydraulic Compressed Air System Upgrade | NEW YORK | Southeastern | $569,208.71 | 419 | Upgrade the existing compressed air systems with energy efficient compressed air system with controls. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Pitkin and Jamaica Maintenance Shop Radiant Heating System | QUEENS | Southeastern | $2,747,752.59 | 1,511 | Installation of infrared heating system at Pitkin and Jamaica Maintenance Shop. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Subway Signal Compressor, Ph.2 - Group 2 | NEW YORK | Southeastern | $5,130,394.10 | 4,195 | Installation of energy efficient air compressors for subway systems. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - 3rd Rail Heater Wireless Controls - Ph.I | KINGS | Southeastern | $4,862,287.00 | 6,606 | Install RF controls to remotely track and monitor 3rd rail heaters from a central location. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | New York City Transit (NYCT) - Atlantic Ave. Cable Section Bldg - Lighting | KINGS | Southeastern | $144,674.00 | 67 | Lighting upgrade. | In Progress | 2013 | |
| Metropolitan Transportation Authority (MTA) | TBTA - Robert Moses Bldg. Lighting Upgrades | NEW YORK | Southeastern | $140,965.07 | 72 | Lighting and Occupancy Sensor Upgrade | In Development | 2013 | |
| Metropolitan Transportation Authority (MTA) | NYCT - Atlantic Ave Cable Section Bldg. - Windows | KINGS | Southeastern | $76,426.83 | 38 | Replacement of windows with energy efficient windows. | In Development | 2013 | |
| Metropolitan Transportation Authority (MTA) | NYCT - 3rd Rail Heater Wireless Controls - Ph.III | NEW YORK | Southeastern | $2,500,000.00 | 3,868 | Install wireless control network to remotely activate 3rd rail heaters from a central location. | In Development | 2013 | |
| Metropolitan Transportation Authority (MTA) | NYCT - Jackie Gleason Bus Depot Solar Thermal Project | KINGS | Southeastern | $223,914.08 | 511 | Installation of solar thermal hot water system | In Development | 2013 | |
| Metropolitan Transportation Authority (MTA) | NYCT - Linden Maintenance Shop Comprehensive | KINGS | Southeastern | $715,491.00 | 274 | Upgrade lighting, lighting controls, and compressed air system | In Development | 2013 | |
| Metropolitan Transportation Authority (MTA) | NYCT - Tunnel Series LED Lighting - Ph.III | NEW YORK | Southeastern | $640,000.00 | 0 | Supplying blue and white LED lights to replace existing CFL and incandescent bulbs used in the subway tunnels. | In Development | 2013 | |
| Metropolitan Transportation Authority (MTA) | NYCT - Bus Depot - Rapid Roll Up Door Installation at Multiple Bus Depots | MULTIPLE | Multiple | $993,120.00 | 359 | Installation of rapid roll up doors at multiple bus depots. | In Development | 2013 | |
| Monroe, County of | Monroe County Mill Seat Landfill Gas Generation Ph.III - CI | MONROE | Central | $10,009,674.64 | 12,967 | Installation of four new Caterpillar 3516 Generator Sets rated at 800KW each and all associated equipment. | In Progress | 2013 | |
| Mount Pleasant, Town of | Town Hall / Garages | WESTCHESTER | Mid-Hudson | $604,751.00 | 145 | Lighting upgrade, installation of occupancy sensors and variable frequency drives on cooling tower motor and hot water/chilled water pumps. Upgrade of controls for HVAC system, replacement of existing chillers. | Completed | 2012 | |
| Mount Vernon, City of | Hall & Court House/Police HQ | WESTCHESTER | Mid-Hudson | $498,620.00 | 589 | Upgrade of lighting and HVAC systems at multiple facilities such as City Hall, courthouses, fire departments and police headquarters. | Completed | 2012 | |
| Nassau, County of | LED Traffic Signals | NASSAU | Southeastern | $8,755,470.47 | 4,893 | Upgrade of incandescent traffic signals with more energy efficient LED based technology at 1,300 intersections. | In Progress | 2013 | |
| New Paltz CSD | New Paltz Central School District - CI | ULSTER | Southeastern | $4,424,435.33 | 1,119 | Installation and upgrades to the lighting, lighting controls, EMS, premium efficiency motors, building envelope, boiler controls, solar hot water heater, upgrade thermostatic radiator valves, replace steam traps and insulate pipes. | In Progress | 2013 | |
| New Rochelle, City of | Garage Lighting - CI | WESTCHESTER | Southeastern | $1,578,987.00 | 578 | Installation of LED garage lighting throughout the city of New Rochelle. There are 2,000 garage lights to be replaced. | In Progress | 2013 | |
| New York Power Authority (NYPA) | Flynn Power Plant | SUFFOLK | Southeastern | $1,547,736.65 | 0 | HVAC system ugrades such as refurbishing AC-3 and AC-4 replacement. | In Progress | 2013 | |
| New York, City of | Brooklyn Public Library - Leonard Branch/Washington Irving Libraries | KINGS | New York City | $87,894.00 | 46 | Installation of energy efficient lighting and occupancy sensors. | Completed | 2012 | Photos |
| New York, City of | New York Public Library (NYPL) - Pelham Bay Branch | BRONX | New York City | $33,113.00 | 40 | Upgrades to lighting and installation of occupancy sensors. | Completed | 2012 | |
| New York, City of | New York Public Library (NYPL) - Wakefield Branch | BRONX | New York City | $46,163.03 | 27 | Installation of high efficiency lighting at the New York Public Library, Wakefield Branch. | Completed | 2012 | |
| New York, City of | Department of Corrections (DOC) - Rikers Island Co-Gen - Ph.2 - Final Design | QUEENS | New York City | $8,777,527.00 | 0 | Construction of a cogeneration plant integrated into the existing heating systems. Phase II of the Rikers Island Cogeneration plant entails the design of the plant from 30% to 100% design and bidding. | Completed | 2012 | Photos |
| New York, City of | Department of Cultural Affairs - Brooklyn Botanical Gardens - Lighting Upgrade | KINGS | New York City | $112,383.00 | 52 | Lighting system upgrade. | Completed | 2012 | |
| New York, City of | The Metropolitan Museum of Art | NEW YORK | New York City | $1,158,533.28 | 529 | Upgrades to lighting and steampipe insulation. | Completed | 2012 | Photos |
| New York, City of | PS-142M - Heavy Oil - Boiler Replacement | NEW YORK | New York City | $2,694,073.00 | 91 | Replaced existing plant and associated equipment with two new dual fuel capable of 199 BHP each boiler. | Completed | 2012 | |
| New York, City of | PS-140M - Heavy Oil - Boiler Replacement | NEW YORK | New York City | $2,500,597.00 | 45 | Replaced existing plant and associated equipment with two new dual fuel capable of 165 BHP each boiler. | Completed | 2012 | |
| New York, City of | PS-9K (Teunis G. Bergen School) - Lighting | KINGS | New York City | $1,401,873.12 | 111 | Upgrades to lighting, occupancy sensors, PCB and asbestos abatement. | Completed | 2012 | |
| New York, City of | PS-121K (Nelson A. Rockefeller School) | KINGS | New York City | $590,937.38 | 66 | Upgrades to lighting and installation of occupancy sensors. | Completed | 2012 | |
| New York, City of | PS-114K (Ryder Elementary School) | KINGS | New York City | $431,607.34 | 64 | Upgrades to lighting and installation of occupancy sensors. | Completed | 2012 | |
| New York, City of | Department of Health and Mental Hygiene (DOHMH) - East Harlem Health Care Ctr (ARRA) | NEW YORK | New York City | $296,363.48 | 67 | Upgrades to lighting and installation of occupancy sensors. Upgrades to radiator valves with new modulating thermostatic valves, and installation of new utility submetering equipment. | Completed | 2012 | |
| New York, City of | Department of Health and Mental Hygiene (DOHMH) - Tremont Health Center | BRONX | New York City | $263,130.50 | 75 | Lighting system upgrade. | Completed | 2012 | |
| New York, City of | Department of Parks and Recreation - Jackie Robinson Ctr Lighting (ARRA) | NEW YORK | New York City | $89,785.42 | 41 | Upgrades to lighting and installation of occupancy sensors. | Completed | 2012 | |
| New York, City of | ARRA Funded Solar PV - Group 2 (Department of Transportation [DOT], Department of Sanitation [DSNY]) | QUEENS | New York City | $1,472,451.93 | 114 | The design and installation of roof top Solar PV at 5 City of New York facilities. | Completed | 2012 | |
| New York, City of | Energy Audits (Group 2 - ARRA Funded) | NEW YORK | New York City | $922,900.00 | 0 | Energy audits performed at 20 City of New York facilities (ARRA-funded). | Completed | 2012 | |
| New York, City of | Energy Audits (Group 3 - ARRA Funded) | NEW YORK | New York City | $999,900.00 | 0 | Energy audits performed at City of New York facilities. | Completed | 2012 | |
| New York, City of | Energy Audits (Group 4 - ARRA Funded) | NEW YORK | New York City | $798,600.00 | 0 | Energy audits performed at City of New York facilities. | Completed | 2012 | |
| New York, City of | Energy Audits (FY10 - Ph.I) | NEW YORK | New York City | $581,350.00 | 0 | Energy audits performed at City of New York facilities. | Completed | 2012 | |
| New York, City of | Taxi and Limousine Commission (TLC) - Woodside Inspection Facility (ARRA) | QUEENS | New York City | $973,526.83 | 146 | Upgrades to lighting and lighting controls, installation of air curtains at the entrance and exit of inspection bays, replacement of infrared heaters, and installation of energy efficient chiller. | Completed | 2012 | |
| New York, City of | Energy Audits | NEW YORK | New York City | $753,364.16 | 0 | Energy audits performed at 21 city-owned facilities. | Completed | 2012 | |
| New York, City of | Health and Hospitals Corporation (HHC) - Elmhurst Hospital Center - Design Only (ARRA-Funded) | QUEENS | New York City | $1,307,194.34 | 0 | Design Only - Upgrades to lighting, and installation of occupancy sensors, control work, boiler replacement (ARRA-funded). | Completed | 2012 | |
| New York, City of | Health and Hospitals Corporation (HHC) - Metropolitan Hospital Center - Design Only (ARRA-Funded) | NEW YORK | New York City | $1,518,984.93 | 0 | 30% Design Only - Upgrades to lighting, and installation of occupancy sensors, control work, boiler replacement (ARRA-funded). | Completed | 2012 | Photos |
| New York, City of | Police Department (NYPD) - 122nd Precinct - Sensors | RICHMOND | New York City | $10,603.69 | 11 | Occupancy sensors installation. | Completed | 2012 | |
| New York, City of | ARRA Funded Solar PV - Group 1 (Police Department [NYPD], Fire Department [FDNY]) | RICHMOND | New York City | $2,018,219.60 | 147 | Design and installation of roof top solar PV at five city-owned facillities. | Completed | 2012 | Photos |
| New York, City of | Police Department (NYPD) - 100TH, 101ST, 114TH, BMS Precincts (ARRA) | QUEENS | New York City | $804,928.00 | 373 | High efficiency lighting technologies replaced older fluorescent and incandescent lighting at each of these facilities. In addition, within this package, one precinct got new double glass, insulated and high efficiency windows. | Completed | 2012 | |
| New York, City of | Queens Public Library (QPL) - Woodhaven | QUEENS | New York City | $30,884.18 | 14 | Lighting system upgrade. | Completed | 2012 | |
| New York, City of | Department of Environmental Protection (DEP) - North River WPCP - Blower Engines - Feasibility Study Only | NEW YORK | New York City | $80,000.00 | 0 | A feasibility study for the DEP North River Waste Water Treatment Plant blower engine optimization. | Completed | 2012 | |
| New York, City of | Department of Environmental Protection (DEP) - North River WPCP - MSP Engines - Feasibility Study Only | NEW YORK | New York City | $80,000.00 | 0 | A feasibility study for the DEP North River Waste Water Treatment Plant main sewage pump engine optimization. | Completed | 2012 | |
| New York, City of | Department of Corrections (DOC) - Rikers Island - Laundry Upgrade - (ARRA) | QUEENS | Southeastern | $6,748,667.83 | 1,071 | Installation of energy efficient industrial tunnel washers, dryers and ironing systems; replacement of window exhaust fans, steam pipe insulation, lighting and HVAC controls. | Completed | 2013 | |
| New York, City of | Department of Cultural Affairs (DCLA) - Bronx Zoo Cogen/MTHW - Ph I (30% Design) | BRONX | Southeastern | $881,669.21 | 0 | 30% - Design documents for Bronx Zoo Cogeneration Loop modification project. | Completed | 2013 | |
| New York, City of | PS-110X (Theodore Shoenfeld School) | BRONX | Southeastern | $1,131,831.39 | 146 | Installation of efficient lighting, occupancy sensors. | Completed | 2013 | |
| New York, City of | Department of Environmental Protection (DEP) - Red Hook WWTP - 900 RPM Generator Change Order | KINGS | Southeastern | $12,136,809.00 | 0 | Installation of two 900-RPM emergency generators. | Completed | 2013 | |