Energy Efficiency Projects

  
  
  
  
  
  
Description
  
  
  
CITY OF NEW YORKDCLA - The Studio Museum in Harlem - Design OnlyNEW YORKSoutheastern
$49,833.86
0
Design only for Studio Museum of Harlem:  Lighting, occupancy sensors, new condensing boilers, air handling   units 
Completed2014
CITY OF NEW YORKDCLA - Staten Island Zoo  / Museum - Design OnlyRICHMONDSoutheastern
$283,650.68
0
Design only work for the Staten Island Zoo. 
Completed2014
CITY OF NEW YORKPS-129X (Twin Parks School)BRONXSoutheastern
$1,689,213.78
211
Lighting, occupancy sensors, premium efficiency   motors. 
Completed2014
CITY OF NEW YORKPS-20M - Heavy Oil - Boiler ReplacementNEW YORKSoutheastern
$2,389,135.98
146
Replace existing plant and associated equipment with two (2) new dual fuel capable of 199 BHP each boiler. 
Completed2014
CITY OF NEW YORKPS-39X (Banana Kelly HS) - Lighting and SensorsBRONXSoutheastern
$1,075,747.78
120
Lighting and wireless vacancy sensors; PCB/ ACM Abatement    
Completed2014
CITY OF NEW YORKMurry Bergtraum High School (ARRA)NEW YORKSoutheastern
$6,143,233.75
1,575
Replacement of single stage absorption chiller, existing cooling towers, and upgrades to control systems and installation of a building automation system. Replace steam   traps and install steam blankets. Install VFD's on fan motors. 
Completed2014
CITY OF NEW YORKIS-126K (John Ericsson Junior High School)KINGSSoutheastern
$1,721,659.25
320
Lighting, Occupancy   sensors, Premium efficiency motors. 
Completed2014
CITY OF NEW YORKPS-22M (New Explorations into Science Technology and Math (NEST) HS)NEW YORKSoutheastern
$1,910,939.79
174
Lighting, occupancy sensors, asbestos and PCB abatement. 
Completed2014
CITY OF NEW YORKIS-220K (John J. Pershing School)KINGSSoutheastern
$1,259,212.81
213
Lighting and wireless vacancy sensors; PCB/ ACM abatement 
Completed2014
CITY OF NEW YORKPS-115K (Daniel Mucatel School)KINGSSoutheastern
$1,825,122.61
157
Lighting and wireless vacancy sensors; PCB/ ACM abatement 
Completed2014
CITY OF NEW YORKCity of New York - Energy Audits (Group 6 - FY 2013)NEW YORKSoutheastern
$2,236,316.88
0
Energy audits at 30 City of New York schools. 
Completed2014
CITY OF NEW YORKCity of New York - Retro-Commissioning Audits - Ph.IIINEW YORKSoutheastern
$571,042.26
0
Retro-Commissioning Audits for NYC facilities. 
Completed2014
CITY OF NEW YORKLeonard Covello Senior Center Comprehensive - DESIGN OnlyNEW YORKSoutheastern
$60,416.94
0
Design only for energy efficiency measures at the Leonard   Covello Senior Center: insulate DHW piping, steam trap upgrade, optimize heating system, upgrade steam controls, and upgrade instantaneous HWH. 
Completed2014
CITY OF NEW YORKCity of New York - Energy Audits (Group 5)NEW YORKSoutheastern
$1,602,204.65
0
Energy audits at City of New York facilities 
Completed2014
CITY OF NEW YORKBronx Family & Criminal Court - Chillers and Cooling TowersBRONXSoutheastern
$6,364,828.00
980
Replacement of two 687 ton centrifugal chillers that utilize R-11 refrigerant with two (2) 750 ton electric centrifugal chillers. In addition, the cooling towers will be replaced.
Completed2014
CITY OF NEW YORKQueens Supreme Court - ChillerQUEENSSoutheastern
$6,141,054.00
730
Replacement of two 350 ton centrifugal chillers that utilize R-11 refrigerant with two 600 ton centrifugal chillers.
Completed2014
CITY OF NEW YORKNYC HHC - Coney Island Hospital - Windows Replacement ProjectKINGSSoutheastern
$10,938,528.00
1,284
Replace existing steel framed single pane windows with energy efficient windows that are double glazed, thermally broken and with low-E coating. 
Completed2014
ISLIP, TOWN OFTown of Islip - High Efficiency Street LightingSUFFOLKSoutheastern
$3,718,575.59
1,341
Replacement of high-pressure sodium, low pressure sodium, and metal halide street lighting with induction-based lighting technology.
Completed2014
ISLIP, TOWN OFTown of Islip - East Street Lighting UpgradeSUFFOLKSoutheastern
$2,406,618.98
1,128
Replacement of high-pressure sodium, low pressure sodium, and metal halide street lighting with induction-based lighting technology.
Completed2014
ISLIP, TOWN OFTown of Islip - LED Traffic Signals & Bldg ECMsSUFFOLKSoutheastern
$1,915,156.85
1,236
Upgrades to LED   traffic signals, high-efficiency lighting and occupancy sensors, boiler burners, energy management and control systems, and HVAC systems at 11 Town of Islip   facilities.  
Completed2014
MONROE, COUNTY OFMonroe County Pure Waters Treatment Facilities - CIMONROECentral
$470,821.02
521
Customer Implemented - replacement of various indoor and outdoor incandescent, fluorescent, mercury vapor, metal halide and high-pressure sodium lighting with high-efficiency LED lighting. 
Completed2014
MTA - Metropolitan Transportation AuthorityNYCT - Site I-Hydraulic Compressed Air System UpgradeNEW YORKSoutheastern
$569,208.71
419
Upgrade the existing compressed air systems with energy   efficient compressed air system with controls. 
Completed2014
MTA - Metropolitan Transportation AuthorityNYCT - Linden Maintenance Shop ComprehensiveKINGSSoutheastern
$646,251.23
274
Upgrade Lighting, lighting controls, and compressed   air system.
Completed2014
MTA - Metropolitan Transportation AuthorityNYCT - Castleton and Yukon Bus Depots - Compressed Air System UpgradeRICHMONDSoutheastern
$219,676.00
91
Install energy efficient   compressed air systems at the NYCTA Castleton and Yukon Bus Depots. 
Completed2014
MTA - Metropolitan Transportation AuthorityNYCT - Tunnel Series LED Lighting - Ph.IIINEW YORKSoutheastern
$899,607.43
1,058
Supplying blue and white LED lights to replace existing  CFL and incandescent bulbs used in the subway tunnels. 
Completed2014
NYC DEPT OF ENVIRONMENTAL PROTECTIONNYC DEP - Engine/Generators Code Compliance Inspection at WWTPQUEENSSoutheastern
$476,594.00
0
Surveys of EngineGenerators installations at predetermined   facilities and preparation of the summary report that will include the results of the inspections in reference to FDNY,NYC Building and NFPA Codes.
Completed2014
NYC DEPT OF ENVIRONMENTAL PROTECTIONNYC DEP - Coney Island WPCP - Engine Optimization - Study OnlyKINGSSoutheastern
$85,000.00
0
Feasibility study to evaluate optimization of Engine  Generators at Coney Island WPCP including overall controls, primary and   auxilliary systems as related to the overall system reliability and performance  including economic and air emissions.
Completed2014
NYC DEPT OF ENVIRONMENTAL PROTECTIONNYC DEP - Wards Island WWTP - Boiler Plant - Ph.1NEW YORKSoutheastern
$17,666,197.00
0
This first   phase of this energy project includes the installation of an interim, high pressure steam, boiler plant with trailer mounted boilers.
Completed2014
NYC DEPT OF ENVIRONMENTAL PROTECTIONNYC DEP - Digester Gas Holder Storage Tanks (PW-81) - Study OnlyRICHMONDSoutheastern
$25,000.00
0
Feasibility Study Only: Evaluation of digester gas  storage tanks at five NYC DEP wastewater pollution control plants (WPCP).
Completed2014
ROCHESTER INSTITUTE OF TECHNOLOGY (RIT)Rochester Institute of Technology (RIT) - Audit OnlyMONROECentral
$2,500.00
0
Audit Only: Installation of energy efficient lighting, motors and VFDs, pool covers, and a solar PV system, upgrades to boilers and chillers, and improvements to building envelopes. 
Completed2014
State of New York (OGS, SUNY, all state agencies)SUNY Upstate Medical University - Ph.ICONONDAGACentral
$447,869.09
73
Installation of new lab hoods and upgrades to the ventilation systems at Weiskotten Hall. 
Completed2014
State of New York (OGS, SUNY, all state agencies)SUNY Purchase - Ph.VI - Chiller and Electrical Service UpgradeWESTCHESTERSoutheastern
$11,763,684.00
1,544
The replacement of one 1000-ton chiller in the central plant with a new, energy efficient ice making chiller and ice storage   equipment.
Completed2014
TUPPER LAKE CSDTupper Lake CSDFRANKLINNorthern
$1,590,895.94
340
Upgrades to lighting and HVAC systems at the L.P. Quinn Elementary School, High School, Bus Garage, and Civic Center.
Completed2014
WEST IRONDEQUOIT CSDWest Irondequoit CSD - Audit OnlyMONROECentral
$2,500.00
0
Audit only -replace the existing boilers with new   condensing boilers at two elementary schools, upgrade pumps and expand the district wide energy management system. 
Completed2014
WHITESTOWN, TOWN OFTown of WhitestownONEIDACentral
$641,557.30
168
Installation of high efficiency  lighting and the replacement of the ice rink refrigeration system. 
Completed2014
YONKERS, CITY OFCity of Yonkers - Energy Efficiency Measures - Ph.IWESTCHESTERSoutheastern
$1,533,119.39
547
Lighting upgrade and upgrade/retro-commissioning of heating control systems at ten (10) buildings in the City of Yonkers.
Completed2014
ALBANY CITY SCHOOLSAlbany City School District - Ph.V (ARRA)ALBANYCentral
$6,088,978.52
1,900
Replacement of three boilers and a DHW heater, installation of two 75 kW CHP units and a pool cover, optimization of chiller plant controls, and upgrades to AHUs, lighting, and the pool heating and ventilation system.
In Development2014
CITY OF NEW YORKNYC DOC - Rikers Island - Central Chiller Plant - Construction Ph.2QUEENSSoutheastern
$6,792,416.52
5,159
Construction Phase 2: installation of a central chiller plant at Rikers   Island. A 960 ton electrical centrifugal chiller, a 1000 ton steam absorption   chiller, and a 700kW back-pressure steam turbine will be installed.  
In Development2014
CITY OF NEW YORKDCLA - Staten Island Zoo / Museum - Lighting & SensorsRICHMONDSoutheastern
$281,767.05
115
Upgrade the lighting system in both the Staten   Island Zoo and Museum. 
In Development2014
CITY OF NEW YORKCo-op City Public Schools CampusBRONXSoutheastern
$15,237,533.76
1,896
Chiller replacement, AHU rehab, and lighting upgrade .
In Development2014
CITY OF NEW YORKIS-383K (Philippa Schuyler School)KINGSSoutheastern
$2,865,314.35
255
Lighting upgrades, wireless vacancy   sensors, and premium efficiency motors.
In Development2014
CITY OF NEW YORKNYC Dept of Parks - Central Park Zoo - LightingNEW YORKSoutheastern
$152,745.34
81
Lighting upgrade
In Development2014
CITY OF NEW YORKBrooklyn Cruise Terminal - Lighting and HVAC UpgradeKINGSSoutheastern
$987,396.58
499
Comprehensive efficiency upgrade of the BCT including Lighting and  HVAC.
In Development2014
CITY OF NEW YORKNYPD - Old 41st Police Precinct - Lighting & SensorsBRONXSoutheastern
$162,236.90
109
Lighting, occupancy sensors. 
In Development2014
CITY UNIVERSITY OF NEW YORKCUNY Internet Metering - CCNYNEW YORKSoutheastern
$400,000.00
0
Installation and commissioning of metering devices   that will allow CUNY to remotely monitor energy usage and evaluate trends and   savings opportunities.  
In Development2014
CITY UNIVERSITY OF NEW YORKCUNY Internet Metering - Software IntegrationNEW YORKSoutheastern
$423,789.00
774
Software Integration   of Existing Utility Meters at CUNY Senior Campuses. This is a real-time,   internet-based, energy monitoring system to help monitor energy consumption,   identify energy savings opportunities, and comply with EO88.
In Development2014
FONDA FULTONVILLE CSDFonda-Fultonville Central School DistrictMONTGOMERYCentral
$1,144,098.88
416
Installation of high-efficiency lighting and controls, a pool cover, and an 80 kW photovoltaic installation.
In Development2014
MONROE, COUNTY OFMonroe County Civic Center - CIMONROECentral
$15,243,099.23
3,616
Customer Implemented - Installation of high efficiency lighting, chilled water control valves,   controls for HVAC systems, premium efficiency motors, a micro-steam turbine,   chilled water piping insulation.
In Development2014
MTA - Metropolitan Transportation AuthorityNYCT - 3rd Rail Heater Wireless Controls - Ph.IVNEW YORKSoutheastern
$3,035,938.05
3,618
Phase IV:install a wireless   control network to remotely activate 3rd rail heaters from a central   location (38th Street Yard - Brooklyn).
In Development2014
MTA - Metropolitan Transportation AuthorityNYCT - Central Electronics Shop Comprehensive ProjectQUEENSSoutheastern
$313,150.40
192
Upgrade lighting and HVAC system in  the building 
In Development2014
NORTHEAST CSDWebutuck CSDDUTCHESSSoutheastern
$934,987.74
348
Installation of high-efficiency lighting and controls at the high school and installation of high-efficiency lighting and controls and a 20.25 kW PV system at the elementary school.
In Development2014
NYC DEPT OF ENVIRONMENTAL PROTECTIONNYC DEP - North River WPCP - Lighting Upgrade - ASHRAE Audit OnlyNEW YORKSoutheastern
$122,428.00
0
ASHRAE audit only for a plant-wide lighting upgrade. 
In Development2014
NYC DEPT OF ENVIRONMENTAL PROTECTIONNYC DEP - SOGR/ECM Planning Task 1 - Wards Island WWTPNEW YORKSoutheastern
$89,526.00
0
Integrate DEP's 10-year State of Good Repair (SOGR)   capital project plan for WWTPs with energy conservation measures (ECMs)   identified by previously-prepared energy audits, and identify any additional   opportunities tosave energy that may be
In Development2014
ORCHARD PARK FIRE DISTRICTOrchard Park Fire DistrictERIEWestern
$113,093.45
24
Lighting retrofits and controls, upgrades to HVAC systems.
In Development2014
PORT AUTHORITY OF NY AND NJPort Authority - Advanced Metering Infrastructure - Phase II MDSPMULTIPLEMultiple
$7,000,000.00
0
Phase II Meter Data   Service Provider (MDSP) services for the meter reading, billing and the   technology hardware and software to convert the process from manual meter   reading to automatic meter reading and billing through digital commun
In Development2014
ROCHESTER, CITY OFCity of Rochester - Ph.III - Blue Cross ArenaMONROECentral
$908,334.09
188
Upgrades to make-up air handling units and the BMS and installation of lighting upgrades and controls and de-stratification fans.
In Development2014
State of New York (OGS, SUNY, all state agencies)NYS DOCCS - Energy Master Plan - Phase IIMULTIPLEMultiple
$920,000.00
0
Development of an Energy Master Plan for the following DOCCS facilities: Gouverneur, Marcy, Riverview, Ogdensburg, Cape Vincent, Watertown, Mid State, Mohawk, Hale Creek, Queensboro, and Cayuga in support of the
In Development2014
State of New York (OGS, SUNY, all state agencies)OGS ESP - Compressor Replacement/VFDALBANYCentral
$1,459,176.15
471
Replacement of the main plant air compressor with a new compressor with a variable frequency drive and installation of a new compressor at the Sheridan Avenue steam plant.
In Development2014
State of New York (OGS, SUNY, all state agencies)OGS - 55 Hanson Place - Lighting and Chiller UpgradeKINGSSoutheastern
$2,249,739.48
534
Upgrade   Building Lighting and Replace (2) 500 ton AC Chillers          
In Development2014
State of New York (OGS, SUNY, all state agencies)NYS OMH - New York Psychiatric InstituteNEW YORKSoutheastern
$1,069,727.11
470
Upgrade lighting, install occupancy   sensors and controls, replace inefficient heat pumps with efficient pumps, add   controls to existing pumps. Incorporate all new controls to the existing   BMS.
In Development2014
State of New York (OGS, SUNY, all state agencies)NYS OMH - Rockland Psychiatric Ctr. - RetrocommissioningROCKLANDSoutheastern
$340,056.48
261
Development and implementation of a retrocommissioning plan the Rockland Psychiatric Center Campus.
In Development2014
State of New York (OGS, SUNY, all state agencies)SUNY Alfred State - Energy Master PlanALLEGANYWestern
$200,257.45
0
The development of a campus-wide Energy Master Plan in support of the Build Smart NY initiative. This EMP will include benchmarking, a letter report, an ASHRAE Level 2 audit, and thermal imaging of select facili
In Development2014
State of New York (OGS, SUNY, all state agencies)SUNY Plattsburgh - Energy Master PlanCLINTONNorthern
$242,916.81
0
Development of an Energy Master Plan for SUNY Plattsburgh in support of the Build Smart NY initiative.
In Development2014
State of New York (OGS, SUNY, all state agencies)SUNY Purchase - Cooling Tower ReplacementWESTCHESTERSoutheastern
$10,180,335.00
252
Replacement of existing 1991 BAC Cooling Towers and   associated pumping and piping system 
In Development2014
State of New York (OGS, SUNY, all state agencies)SUNY Upstate Medical University - Ph.IONONDAGACentral
$8,497,521.92
2,023
Installation of VAV boxes, air intake dampers, space dampers, VFDs, and energy efficient electric motors and upgrades to EMS and lighting at Weiskotten Hall.
In Development2014
AMSTERDAM CITY SCHOOLSGreater Amsterdam School District - Pool HeatingMONTGOMERYCentral
$444,932.13
132
Installation of a new pool heating system including an automatic pool cover, high-efficiency boilers, and solar thermal collectors and installation of a 6 kW photovoltaic solar array.
In Progress2014
BOCESBOCES - Washington-Saratoga-Warren-Hamilton-EssexSARATOGACentral
$3,764,185.17
704
Installation of a new chiller and lighting and an upgrade to the BMS at the F. Donald Myers Building and installation of new boilers and lighting and an upgrade to the BMS at the Southern Adirondack Building.
In Progress2014
CITY OF NEW YORKNew York Botanical Garden - Watson Library ComplexBRONXSoutheastern
$1,219,946.28
142
Installation of new energy efficient chillers, chilled water   controls and sensors, HVAC demand ventilation controls and air-handling unit   upgrades. 
In Progress2014
CITY OF NEW YORKNYC DOC - Rikers Island Co-Gen - Ph.3 - Prepurchase of Major EquipmentQUEENSSoutheastern
$20,935,859.99
0
Purchase of gas turbines, heat recovery steam generators,   gas compressors, electric switch gear, for the implementation of the Rikers   Island Cogen project. 
In Progress2014
CITY OF NEW YORKNYC DOC - Rikers Island - Central Chiller Plant - 100% DesignQUEENSSoutheastern
$2,650,967.00
0
Phase I. Develop 100 % Design document for the installation of a 2,000 ton central   chiller plant with auxiliary equipment to support air-conditioning loads for   several buildings and inlet cooling needs for the Co-Generation Plant.    
In Progress2014
CITY OF NEW YORKNYC DOC - Rikers Island - Central Chiller Plant - Construction Ph.1QUEENSSoutheastern
$20,325,259.60
0
Construction Phase 1:installation of a central chiller plant at Rikers Island A 960 ton electrical centrifugal chiller, a 1000 ton steam   absorption chiller, and a 700kW back-pressure steam turbine will be installed. Project will insta
In Progress2014
CITY OF NEW YORKNYC DOC - Rikers Island Co-Gen - Ph.4 - Construction Ph.1QUEENSSoutheastern
$56,630,490.00
0
Construction of a 15MW cogeneration plant integrated into the existing   heating systems. Phase IV (final) of the Rikers Island Cogeneration plant   entails the actual construction of the plant. 
In Progress2014
CITY OF NEW YORKNYC DOC - Rikers Island Co-Gen - Ph.5 - Construction Ph.2QUEENSSoutheastern
$34,113,237.26
22,083
Rikers Island Co-Gen Ph. 5 includes the second phase of construction costs to build a cogeneration plant.
In Progress2014
CITY OF NEW YORKDCLA - Bronx Zoo - MTHW Loop Replacement- Ph II (30% - Final Design)BRONXSoutheastern
$942,609.70
0
Design only CIC for the cost of 30% to Final Design of the MTHW Cogen loop replacement 
In Progress2014
CITY OF NEW YORKDCLA - Bronx Zoo - Lighting, Motors, and VFDsBRONXSoutheastern
$1,710,438.38
898
Lighting, motors and VFDs 
In Progress2014
CITY OF NEW YORKDCLA - New York Hall of ScienceQUEENSSoutheastern
$690,764.00
211
Upgrade lighting. 
In Progress2014
CITY OF NEW YORKIS-218K (James P. Sinnott School)KINGSSoutheastern
$1,903,051.34
179
Lighting upgrades, wireless vacancy sensors, and steam trap replacement 
In Progress2014
CITY OF NEW YORKPS-99M (Academy of Environmental Science Secondary HS)NEW YORKSoutheastern
$1,708,807.74
182
Lighting upgrades and wireless vacancy sensors 
In Progress2014
CITY OF NEW YORKPS-21X (Philip H. Sheridan)BRONXSoutheastern
$1,484,912.49
137
Install energy efficient lighting, occupancy sensors, remove   asbestos/PCBs. 
In Progress2014
CITY OF NEW YORKIS-33K (Mark Hopkins Intermediate School) - LightingKINGSSoutheastern
$3,075,283.51
161
Lighting, occupancy sensors, PCB/Asbestos abatement. 
In Progress2014
CITY OF NEW YORKPS-307K (Daniel Hale Williams School)KINGSSoutheastern
$2,070,176.56
191
Upgrade lighting and install occupancy sensors. Remove asbestos/PCBs. 
In Progress2014
CITY OF NEW YORKPS-81K (Thaddeus Stevens School)KINGSSoutheastern
$2,554,444.10
141
Upgrade lighting, install occupancy sensors, removal of any asbestos and PCBs. 
In Progress2014
CITY OF NEW YORKIS-302K (Rafael Cordero MS) - Lighting and MotorsKINGSSoutheastern
$2,236,576.55
317
Lighting, occupancy sensors,premium efficiency motors, asbestos/PCB abatement 
In Progress2014
CITY OF NEW YORKPS-721M (Manhattan Occupational Training Ctr)NEW YORKSoutheastern
$1,779,664.84
272
Lighting, Lighting controls, Steam traps DDC for Night Setback  
In Progress2014
CITY OF NEW YORKPS-54XBRONXSoutheastern
$784,868.12
211
Lighting and Controls, BMS Upgrades and Commissioning, Thermostats, VFD’s, Metering. 
In Progress2014
CITY OF NEW YORKNYC Dept of Parks - 5-Boro ComplexNEW YORKSoutheastern
$1,740,050.11
308
Installation of two new energy efficient boilers and ancillary equipment and controls. 
In Progress2014
CITY OF NEW YORKDSNY - Betts Ave - Boiler (ARRA)QUEENSSoutheastern
$764,996.07
165
Summer Boiler installation, and installation of energy   efficient steam generator.
In Progress2014
CITY OF NEW YORKCo-op City Public Schools Campus - LightingBRONXSoutheastern
$3,086,807.96
243
Lighting upgrade and occupancy sensor installation 
In Progress2014
CITY OF NEW YORKCity of New York - End Use Metering ServicesNEW YORKSoutheastern
$319,613.50
0
End-use monitoring program for continuous real-time   monitoring and end-use metering. Pilot project at 10 City of New   York sites. Design, install,collect, display and host end-use and whole facility   metering.
In Progress2014
CITY OF NEW YORKCity of New York - Energy & RCx Audits (Group 7 FY14)NEW YORKSoutheastern
$2,004,190.36
0
Perform Energy and Retro-Commissioning Audits 
In Progress2014
CITY OF NEW YORKFDNY - Eng. Co. 264, 265, 266, 268 and 329 - Solar ThermalQUEENSSoutheastern
$554,150.44
15
Retrofit existing hot water heating system with solar thermal systems.
In Progress2014
CITY OF NEW YORKNYC HHC - Elmhurst Hospital CenterQUEENSSoutheastern
$28,462,000.80
8,541
Boiler replacement, air handling unit upgrades, buiding management system, lighting, occupancy sensors, underground tank removal and replacement, removal of asbestos and PCBs. 
In Progress2014
CITY OF NEW YORKNYC HHC - Coney Island Hospital - Boiler UpgradeKINGSSoutheastern
$9,933,724.00
3,593
Upgrade boiler system with energy efficient equipment at Coney Island Hospital. Amended original scope on July 2013 to raise new boilers and associated equipment above the FEMA designated 100-year flood line. 
In Progress2014
CITY OF NEW YORKNYC HHC - Metropolitan Hospital CenterNEW YORKSoutheastern
$34,349,704.52
6,030
Boiler replacement, air handling unit upgrades, buiding management system, lighting, occupancy sensors,underground tank removal and replacement, removal of asbestos and PCBs. 
In Progress2014
CITY OF NEW YORKNYPD - Forensic Investigation Division Lab - HVACQUEENSSoutheastern
$7,196,661.64
1,190
Energy efficient chillers,premium efficiency motors,gas-fired   efficient domestic hot water heater two air handler units upgrade facility electrical service to accomodate new equipment, and integrate new equipment into existing facility.
In Progress2014
CITY OF NEW YORKNYPD - Police Headquarters (ARRA)NEW YORKSoutheastern
$17,862,991.83
4,584
Install high efficiency lighting, lighting controls, upgrade BMS and air handling units controls, refurbish air handling units,   optimize chiller plant, upgrade the cooling equipment used in the data center to energy efficient. 
In Progress2014
CITY OF NEW YORKNYPD - 69th PrecinctKINGSSoutheastern
$1,065,669.39
83
Installation of energy efficient chiller and boiler at the NYPD 69th   Precinct: replacement of two chillers (20-ton each) with a single forty ton high   efficiency air-cooled chiller. Replace existing boiler with a high efficiency   boiler.   
In Progress2014
CITY UNIVERSITY OF NEW YORKCUNY Internet Metering - Medgar Evers College - Technology UpgradeNEW YORKSoutheastern
$392,593.00
173
Complete Remaining 1B Campuses for Internet   Metering. This involves installing "Data Gathering" devices which connect   to the utility meter and then upload the energy data to an internet server   provided by the customer that will be used to
In Progress2014
CITY UNIVERSITY OF NEW YORKCUNY Bronx C.C. - Ph.3: Utility Upgrade - CHW and HW DistributionBRONXSoutheastern
$22,000,000.50
0
This project is a   continuation of Phase 1 for the installation of a high efficiency centralized chiller plant and power efficiency upgradeThis phase will include the continued installation of underground utilities throughout the campus,
In Progress2014
CITY UNIVERSITY OF NEW YORKCUNY City College of New York Ph.1 - Control Valve ReplacementNEW YORKSoutheastern
$4,994,770.00
1,156
Replacement of chilled water coil control valves at all air handling units, with new energy efficient pressure independent control valves at eight CCNY buildings.
In Progress2014
1 - 100Next