Akron, Village ofVillage Insulation ProgramERIEWestern New York
$134,516.61
98
Installation of energy efficient insulation in 52 residents' homes.
Completed2012
Boonville, Town ofVillage Insulation ProgramONEIDAMohawk Valley
$25,496.00
21
Municipal Commission of Boonville Electric System installed energy efficient insulation in 11 residents' homes. 
Completed2012
Churchville, Village ofVillage Insulation ProgramMONROEFinger Lakes
$15,635.60
13
The village weatherized  homes, saving approximately $200 per home.  
Completed2012
Clinton CSDClinton Central School DistrictONEIDAMohawk Valley
$3,750,552.36
875
The installation of energy efficient lighting, HVAC upgrades, electric motor replacements, boiler replacements and hot water heater systems. 
Completed2012
Cortland, County ofCortland CountyCORTLANDCentral New York
$1,695,244.52
267
Boiler replacements, chiller replacement and energy management system upgrades at the county office building and courthouse. 
Completed2012
Endicott, VIllage ofVillage Insulation ProgramBROOMESouthern Tier
$32,620.00
27
Customer-implemented program with the Village of Endicott Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 14 residents' homes. 
Completed2012
Fairport, Village ofVillage Insulation ProgramMONROEFinger Lakes
$296,200.00
243
The installation of energy efficient insulation in 131 residents' homes.
Completed2012
Groton, Village ofVillage Insulation  ProgramTOMPKINSSouthern Tier
$80,612.00
66
Customer-implemented program with the Village of Groton Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in two residents' homes. 
Completed2012
Hamilton, Village ofVillage Insulation ProgramMADISONCentral New York
$114,731.00
94
Customer-implemented program with the Village of Hamilton System. Customer partnered with the IEEP for the installation of energy efficient insulation in residents' homes. 
Completed2012
Lake Placid, Village ofVillage Insulation ProgramESSEXNorth Country
$275,579.00
226
Customer-implemented program with the Village of Lake Placid, Inc. Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 121 residents' homes.
Completed2012Photos
Mayville, Village ofVillage Insulation  ProgramCHAUTAUQUAWestern New York
$47,776.00
39
Customer-implemented program with the Village of Mayville Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 21 residents' homes. 
Completed2012
Metropolitan Transportation Authority (MTA)Metro North - North White Plains - Ph.II LightingWESTCHESTERMid-Hudson
$585,952.65
351
Upgrade of lighting system and installation of a new electric compressor. 
Completed2012
Metropolitan Transportation Authority (MTA)Metro North - Grand Central Terminal - Ph.INEW YORKNew York City
$1,512,868.00
796
Phase I: Upgrade of lighting, replacement of motors, air compressors and installation of advanced metering. 
Completed2012Photos
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Jerome Maintenance Yard - Compressor UpgradeBRONXNew York City
$74,804.47
51
Upgrade of compressed air system in building. 
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Jamaica Train Yard - HVAC and WindowsQUEENSNew York City
$318,626.05
62
Installation of roof top central HVAC (heat pump system) and duct work, and replacement of inefficient windows with double-pane energy efficient windows.
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Maspeth Warehouse Lighting & Occupancy Sensor ProjectQUEENSNew York City
$248,757.27
239
Upgrade of lighting and installation of occupancy sensors in the building. 
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Pelham Yard - Solar Thermal Hot WaterBRONXNew York City
$230,733.93
30
Installation of boiler controls and more efficient domestic water heater.
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - 207th Street Train Yard - LightingNEW YORKNew York City
$618,718.35
591
Upgrade of lighting system.
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Coney Island Yard - Wheel/Axle and Motor Shop LightingKINGSNew York City
$159,519.07
193
Installation of energy efficient lighting.
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Tunnel Series LED Lighting - Ph.INEW YORKNew York City
$417,823.00
405
The replacement of existing 35-watt incandescent series lamps powered on 600V AC or DC with 10-watt LED Series bulbs. Approximately 5,000 units will be replaced in Phase I. 
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Tunnel Series LED Lighting - Ph. IINEW YORKNew York City
$1,300,722.00
1,168
The replacement of existing white and blue Panasonic 22-watt CFLs located along subway tunnel walls with a 10-watt LED bulb and replacement of existing 36-watt white and approximately 13 blue incandescent bulbs located in subway tunnel interior.  
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - 3rd Rail Heater Wireless Controls - Ph.IIKINGSNew York City
$2,552,081.00
3,498
The installation of wireless RF controls to monitor, control third rail heating elements.  
Completed2012
Mount Pleasant, Town ofTown Hall / GaragesWESTCHESTERMid-Hudson
$604,751.00
145
Lighting upgrade, installation of occupancy sensors and variable frequency drives on cooling tower motor and hot water/chilled water pumps. Upgrade of controls for HVAC system, replacement of existing chillers.
Completed2012
Mount Vernon, City ofHall & Court House/Police HQWESTCHESTERMid-Hudson
$498,620.00
589
Upgrade of lighting and HVAC systems at multiple facilities such as City Hall, courthouses, fire departments and police headquarters.
Completed2012
New York, City ofBrooklyn Public Library - Leonard Branch/Washington Irving LibrariesKINGSNew York City
$87,894.00
46
Installation of energy efficient lighting and occupancy sensors.
Completed2012Photos
New York, City ofNew York Public Library (NYPL) - Pelham Bay BranchBRONXNew York City
$33,113.00
40
Upgrades to lighting and installation of occupancy sensors. 
Completed2012
New York, City ofNew York Public Library (NYPL) - Wakefield BranchBRONXNew York City
$46,163.03
27
Installation of high efficiency lighting at the New York Public Library, Wakefield Branch.  
Completed2012
New York, City ofDepartment of Corrections (DOC) - Rikers Island Co-Gen - Ph.2 - Final DesignQUEENSNew York City
$8,777,527.00
0
Construction of a cogeneration plant integrated into the existing heating systems. Phase II of the Rikers Island Cogeneration plant entails the design of the plant from 30% to 100% design and bidding. 
Completed2012Photos
New York, City ofDepartment of Cultural Affairs - Brooklyn Botanical Gardens - Lighting UpgradeKINGSNew York City
$112,383.00
52
Lighting system upgrade.  
Completed2012
New York, City ofThe Metropolitan Museum of ArtNEW YORKNew York City
$1,158,533.28
529
Upgrades to lighting and steampipe insulation. 
Completed2012Photos
New York, City ofPS-142M - Heavy Oil - Boiler ReplacementNEW YORKNew York City
$2,694,073.00
91
Replaced existing plant and associated equipment with two new dual fuel capable of 199 BHP each boiler. 
Completed2012
New York, City ofPS-140M - Heavy Oil - Boiler ReplacementNEW YORKNew York City
$2,500,597.00
45
Replaced existing plant and associated equipment with two new dual fuel capable of 165 BHP each boiler. 
Completed2012
New York, City ofPS-9K (Teunis G. Bergen School) - LightingKINGSNew York City
$1,401,873.12
111
Upgrades to lighting, occupancy sensors, PCB and asbestos abatement. 
Completed2012
New York, City ofPS-121K (Nelson A. Rockefeller School)KINGSNew York City
$590,937.38
66
Upgrades to lighting and installation of occupancy sensors. 
Completed2012
New York, City ofPS-114K (Ryder Elementary School)KINGSNew York City
$431,607.34
64
Upgrades to lighting and installation of occupancy sensors. 
Completed2012
New York, City ofDepartment of Health and Mental Hygiene (DOHMH) - East Harlem Health Care Ctr (ARRA)NEW YORKNew York City
$296,363.48
67
Upgrades to lighting and installation of occupancy sensors. Upgrades to radiator valves with new modulating thermostatic valves, and installation of new utility submetering equipment.  
Completed2012
New York, City ofDepartment of Health and Mental Hygiene (DOHMH) - Tremont Health CenterBRONXNew York City
$263,130.50
75
Lighting system upgrade.  
Completed2012
New York, City ofDepartment of Parks and Recreation  - Jackie Robinson Ctr Lighting (ARRA)NEW YORKNew York City
$89,785.42
41
Upgrades to lighting and installation of occupancy sensors. 
Completed2012
New York, City ofARRA Funded Solar PV - Group 2 (Department of Transportation [DOT], Department of Sanitation [DSNY])QUEENSNew York City
$1,472,451.93
114
The design and installation of roof top Solar PV at 5 City of New York facilities.
Completed2012
New York, City ofEnergy Audits (Group 2 - ARRA Funded)NEW YORKNew York City
$922,900.00
0
Energy audits performed at 20 City of New York facilities (ARRA-funded).    
Completed2012
New York, City ofEnergy Audits (Group 3 - ARRA Funded)NEW YORKNew York City
$999,900.00
0
Energy audits performed at City of New York facilities.    
Completed2012
New York, City ofEnergy Audits (Group 4 - ARRA Funded)NEW YORKNew York City
$798,600.00
0
Energy audits performed at City of New York facilities.    
Completed2012
New York, City ofEnergy Audits (FY10 - Ph.I)NEW YORKNew York City
$581,350.00
0
Energy audits performed at City of New York facilities.    
Completed2012
New York, City ofTaxi and Limousine Commission (TLC) - Woodside Inspection Facility (ARRA)QUEENSNew York City
$973,526.83
146
Upgrades to lighting and lighting controls, installation of air curtains at the entrance and exit of inspection bays, replacement of infrared heaters, and installation of energy efficient chiller.  
Completed2012
New York, City ofEnergy AuditsNEW YORKNew York City
$753,364.16
0
Energy audits performed at 21 city-owned facilities.
Completed2012
New York, City ofHealth and Hospitals Corporation (HHC) - Elmhurst Hospital Center - Design Only (ARRA-Funded)QUEENSNew York City
$1,307,194.34
0
Design Only - Upgrades to lighting, and installation of occupancy sensors, control work,  boiler replacement (ARRA-funded).
Completed2012
New York, City ofHealth and Hospitals Corporation (HHC) - Metropolitan Hospital Center - Design Only (ARRA-Funded)NEW YORKNew York City
$1,518,984.93
0
30% Design Only - Upgrades to lighting, and installation of occupancy sensors, control work, boiler replacement (ARRA-funded).
Completed2012Photos
New York, City ofPolice Department (NYPD)  - 122nd Precinct - SensorsRICHMONDNew York City
$10,603.69
11
Occupancy sensors installation.
Completed2012
New York, City ofARRA Funded Solar PV - Group 1 (Police Department [NYPD], Fire Department [FDNY])RICHMONDNew York City
$2,018,219.60
147
Design and installation of roof top solar PV at five city-owned facillities.
Completed2012Photos
New York, City ofPolice Department (NYPD) - 100TH, 101ST, 114TH, BMS Precincts (ARRA)QUEENSNew York City
$804,928.00
373
High efficiency lighting technologies replaced older fluorescent and incandescent lighting at each of these facilities. In addition, within this package, one precinct got new double glass, insulated and high efficiency windows.
Completed2012
New York, City ofQueens Public Library (QPL) - WoodhavenQUEENSNew York City
$30,884.18
14
Lighting system upgrade.
Completed2012
New York, City ofDepartment of Environmental Protection (DEP) - North River WPCP - Blower Engines - Feasibility Study OnlyNEW YORKNew York City
$80,000.00
0
A feasibility study for the DEP North River Waste Water Treatment Plant blower engine optimization.
Completed2012
New York, City ofDepartment of Environmental Protection (DEP)  - North River WPCP - MSP Engines - Feasibility Study OnlyNEW YORKNew York City
$80,000.00
0
A feasibility study for the DEP North River Waste Water Treatment Plant main sewage pump engine optimization.  
Completed2012
New York, State ofDepartment of Corrections and Community Supervision (DOCCS) - Arthur Kill Correctional Facility - Ph.2 - Boiler Plant UpgradeRICHMONDNew York City
$7,751,504.00
703
The replacement of the three existing boilers with two new 600 BHP and one new 300 BHP boilers, and the installation of new hot/chilled water pumps, and boiler feed tank and pumps.
Completed2012
New York, State ofDepartment of Transportation (DOT) - UticaONEIDAMohawk Valley
$256,610.56
85
Lighting replacement and retrofit, installation of occupancy sensor, HVAC upgrades and building envelope improvements.
Completed2012
New York, State ofOffice of General Services (OGS) Empire State Plaza - Chiller Project # 1 - Steam TurbineALBANYCapital District
$9,215,681.10
12,137
The replacement of an existing outdated steam turbine with modern high efficiency steam turbine. Retrofitted chiller control panel to maintain chiller optimization.
Completed2012
New York, State ofOffice of General Services (OGS) Empire State Plaza - East GarageALBANYCapital District
$205,426.75
228
The installation of a photocell control system to reduce perimeter and general lighting during the day. Installed high efficiency lighting upgrades with bi-level photocell controls.
Completed2012
New York, State ofCapitol LED Lighting - ARRA FundedALBANYCapital District
$213,083.35
17
The installaion of advanced technology LED Lighting in 2nd floor, north corridor of Capitol Building.
Completed2012
New York, State ofOffice of General Services (OGS) - 55 Hanson Place - Boiler UpgradeKINGSNew York City
$2,733,555.00
254
The installation of four new high efficiency condensing boilers. Installation of a new  domestic hot water heater, pumps and auxiliary equipment. 
Completed2012
New York, State ofOffice of Mental Health (OMH) - Pilgrim Psychiatric Ctr. - Ph.1SUFFOLKLong Island
$1,708,581.11
892
The replacement of existing fluorescent and incandescent fixtures with high efficiency lighting and ballasts. Upgraded the low efficiency motors with premium efficient motors, upgraded the building envelope, upgraded the energy management system.
Completed2012
New York, State ofOffice of Mental Health (OMH) - Rockland Psychiatric Ctr. - Ph.1ROCKLANDMid-Hudson
$747,798.00
602
Retrofitted existing lighting fixtures with new energy efficient lamps and ballasts. Lighting controls installed in wing hallways and various office and multi-use spaces throughout the Rockland Psychiatric Center. 
Completed2012
New York, State ofState Education Department (SED) - CEC Stack LightingALBANYCapital District
$285,977.44
144
Installation of energy efficient lighting and lighting controls.
Completed2012
New York, State ofState University of New York (SUNY) Oneonta - Ph.VIIOTSEGOMohawk Valley
$173,652.30
73
Replacement of existing electric motors with new premium efficiency motors. 
Completed2012
New York, State ofState University of New York (SUNY) Brockport - Ph.4MONROEFinger Lakes
$4,776,201.28
1,952
Implementation of water sub-metering, domestic water heating improvements, small chiller for space with partial loads, boiler burner replacements, lighting upgrades and occupancy sensors, and direct digital EMS upgrade.
Completed2012
New York, State ofState University of New York (SUNY) Albany - Ph.VIIALBANYCapital District
$4,078,128.80
1,105
Replacement of light fixtures in the podium buildings. The new fixtures were installed in classrooms, lecture halls, labs, offices and stairwells. 
Completed2012Photos
New York, State ofState University of New York (SUNY) Brockport - SERCMONROEFinger Lakes
$2,419,056.64
605
The installation of ice thermal storage, white roof, T5 lighting and occupancy sensors, fan and pump motor VFDs and energy management controls. 
Completed2012Photos
New York, State ofState University of New York (SUNY) Upstate Medical University - Ph.VONONDAGACentral New York
$611,143.15
336
All buildings: campus-wide electrical, natural gas and steam sub-metering, as part of the multi-phase installation of energy efficient  measures to monitor the facility energy usage. 
Completed2012
New York, State ofState University of New York (SUNY) Upstate Medical University - Ph.IBONONDAGACentral New York
$335,212.14
62
Upgrades to the HVAC and lighting systems.  
Completed2012
Philadelphia, Village ofVillage Insulation ProgramJEFFERSONNorth Country
$30,370.00
25
The installation of energy efficient insulation in four residents' homes. 
Completed2012
Putnam, County ofPutnam National Golf Course Boiler ReplacementPUTNAMMid-Hudson
$535,556.38
23
Replacement of boiler at the Putnam National Golf Course.
Completed2012
Putnam, County ofCounty Office Building - Boiler ReplacementPUTNAMMid-Hudson
$486,039.62
34
Replacement of boiler at the Putnam County Office Building.
Completed2012
Rouses Point, Village ofVillage Insulation ProgramCLINTONNorth Country
$246,708.00
202
Electric System installed energy efficient insulation in 109 residents' homes. 
Completed2012
Solvay, Village ofVillage Insulation ProgramONONDAGACentral New York
$860,105.00
706
Electric System installed energy efficient insulation in 379 residents' homes. 
Completed2012
Spencerport, Village ofVillage Insulation ProgramMONROEFinger Lakes
$80,612.00
66
Electric System installed energy efficient insulation in 36 residents' homes.
Completed2012
Springville, Village ofVillage Insulation ProgramERIEWestern New York
$73,113.00
60
Village weatherized 32 homes by installing attic and/or crawl space insulation.    
Completed2012
Steuben, County ofARRASTEUBENSouthern Tier
$376,180.52
182
Upgrade of lighting and installation of a new energy efficient chiller.  
Completed2012
Tupper Lake, Village ofVillage Insulation ProgramFRANKLINNorth Country
$1,500,000.00
89
Insulated 47 homes. 
In-Progress2012
Wellsville, Village ofVillage Insulation ProgramALLEGANYWestern New York
$267,812.50
141
Weatherized 32 homes under this program by installing attic and/or crawl space insulation. 
Completed2012
Westchester, County ofCounty-Wide Energy Management System UpgradeWESTCHESTERMid-Hudson
$2,925,785.14
448
Modernized an existing control system, and replaced  outdated or non-functioning controllers.
Completed2012
Westchester, County ofCounty Center - Lighting UpgradeWESTCHESTERMid-Hudson
$518,497.00
310
Energy efficient lighting upgrade.
Completed2012
Westfield, Village ofVillage Insulation ProgramCHAUTAUQUAWestern New York
$30,370.00
25
Insulated 13 homes.
Completed2012
CITY OF NEW YORKDCLA - Bronx Zoo Cogen/MTHW - Ph I (30% Design)BRONXSoutheastern
$814,669.21
0
        30%   Design Documents for the Bronx Zoo Cogeneration Loop modification project. This   is Phase I of the project, and upon completion of this deliverable, the CIC for   Phase II will be prepared.
Completed2013
CITY OF NEW YORKCity of New York - Energy Audits - Phase 2BNEW YORKSoutheastern
$653,050.00
0
Energy audits at City of New York facilities.    
Completed2013
CITY OF NEW YORKCity of New York - Energy Audits - Phase 2NEW YORKSoutheastern
$321,693.38
0
Energy audits at City of New York facilities   
Completed2013
CITY OF NEW YORKNYC HRA - Bushwick Multi-Service Center - 90% Design OnlyKINGSSoutheastern
$34,490.36
0
90% Design documents only for lighting, occupancy sensors, exit  sign replacement 
Completed2013
CITY OF NEW YORKPS-110X (Theodore Shoenfeld School)BRONXSoutheastern
$1,131,831.39
146
Lighting, occupancy sensors
Completed2013
CITY OF NEW YORKCity of New York - HHC - Energy Audits Group I (ARRA Funded)NEW YORKSoutheastern
$143,000.00
0
Energy audits at City of New York  facilities 
Completed2013
CITY OF NEW YORKDSNY - Queens North Borough Repair Shop Ph.II (ARRA)QUEENSSoutheastern
$2,228,261.73
167
Installation of two high efficiency roof top chiller units, 3 air handling   units, associated controls, and white roof application. 
Completed2013
CITY OF NEW YORKNYC DOC - Rikers Island - Laundry Upgrade - (ARRA funded)QUEENSSoutheastern
$6,748,667.83
1,071
Installation of energy efficient industrial tunnel washers, dryers, and   ironing systems to replace and remove existing, inefficient washers, dryers, and   ironers, replacement of window exhaust fans, steam pipe insulation, lighting,  and HVAC
Completed2013
CITY OF NEW YORKNYC Dept of Parks - St Mary's Recreation CenterBRONXSoutheastern
$447,336.89
491
Upgrade lighting, install pool cover, upgrade motors, upgrade steam   traps. 
Completed2013
CITY OF NEW YORKNYC DEP - Red Hook WWTP - 900 RPM GeneratorKINGSSoutheastern
$13,346,642.00
0
Install (2) 900 RPM Emergency Generators
Completed2013
CITY OF NEW YORKNYC DEP - Red Hook WWTP - Peak Load Management UpgradeKINGSSoutheastern
$23,747,995.00
0
Complete evaluation and upgrade of two existing 1800 kW generators, including all associated auxiliaries and controls.  In addition, the replacement of the existing inoperable key interlock system is required. 
Completed2013
CITY OF NEW YORKCity of New York - Retro-Commissioning Audits (ARRA) FY012 Ph.1NEW YORKSoutheastern
$315,276.50
0
Perform retro-commissioning audits under option 2 for the city of new york.  Projects are to be paid using ARRA funding.    
Completed2013
CITY OF NEW YORKCity of New York - Retro-Commissioning Audits (ARRA) FY012 Ph.2NEW YORKSoutheastern
$60,764.00
0
Retro-Commissioning Audits for Sarah Hale HS, PS   20Q, PS 120Q, PS 112X 
Completed2013
CITY OF NEW YORKDSNY - Betts Avenue - LightingQUEENSSoutheastern
$207,857.56
154
Upgrade lighting and install occupancy sensors. 
Completed2013
CITY OF NEW YORKDSNY - Queens 5 & 5A District Garages - LightingQUEENSSoutheastern
$230,749.61
154
Install high efficiency lighting and occupancy sensors. 
Completed2013
CITY OF NEW YORKDSNY - Bronx 9, 10, & 11 District Garages - LightingBRONXSoutheastern
$70,727.17
29
Lighting and occupancy sensors 
Completed2013
CITY OF NEW YORKPS-69X (The New Vision School)BRONXSoutheastern
$338,691.38
68
Lighting, occupancy sensors. 
Completed2013
CITY OF NEW YORKPS-2X (The Morrisania School)BRONXSoutheastern
$724,341.11
89
Lighting, occupancy sensors and domestic hot water heater  replacement. 
Completed2013
CITY OF NEW YORKPS-20Q (John Bowne School) - LightingQUEENSSoutheastern
$702,399.73
862
Lighting, occupancy sensors,  PCB and asbestos abatement. 
Completed2013
1 - 100Next