Akron, Village ofVillage Insulation ProgramERIEWestern New York
$134,516.61
98
Installation of energy efficient insulation in 52 residents' homes.
Completed2012
Albany City SchoolsAlbany City School District - Ph.V (ARRA)ALBANYCentral
$6,088,978.52
1,900
Includes the replacement of three boilers,   installation of two 75KW combined heat and power units, replacement of the   domestic hot water heater, optimization of chiller plant controls  upgrade   of air handeling units
In Development2014
Albany City SchoolsPh.V (ARRA)ALBANYCentral
$6,088,978.52
1,900
Includes the replacement of three boilers, installation of two 75KW combined heat and power units, replacement of the domestic hot water heater, optimization of chiller plant controls, upgrade of air handling units, upgrade of lighting, upgrade pool heating and ventilation system, and installation of a pool cover.
In Development2013
AMSTERDAM CITY SCHOOLSGreater Amsterdam School District - Pool HeatingMONTGOMERYCentral
$444,932.13
132
Install a new pool heating system to include an automatic pool cover, new high efficiency boilers and solar thermal collectors. Install a 6 KW Photovoltaic solar array on the roof to offset district electrical energy costs.
In Progress2014
Amsterdam City SchoolsGreater Amsterdam School District - Pool HeatingMONTGOMERYCentral
$444,932.13
132
Installation of a new pool heating system, automatic pool cover, high efficiency boilers, solar thermal collectors and 6 KW photovoltaic solar array on the roof. 
In Progress2013
Blenheim, Town ofTown of BlenheimSCHOHARIECentral
$51,736.41
11
Installation of new heating coltrols and upgrades; upgrading of building insulation; installation of energy efficient lighting and 4.4KW Solar PV system.
In Development2013
BOCESBOCES - Washington-Saratoga-Warren-Hamilton-EssexSARATOGACentral
$3,764,185.17
704
Installation of new chiller, lighting and upgrade of building management system at Myers Building and new boilers, lighting and upgrade of building management system at Southern Adirondack Building.
In Progress2013
BOCESBOCES - Washington-Saratoga-Warren-Hamilton-EssexSARATOGACentral
$3,764,185.17
704
Installation of a new chiller,   installation of new lighting and an upgrade of the Building Management System at   the F. Donald Myers Building and the installation of new boilers, installation   of new lighting among others
In Progress2014
Boonville, Town ofVillage Insulation ProgramONEIDAMohawk Valley
$25,496.00
21
Municipal Commission of Boonville Electric System installed energy efficient insulation in 11 residents' homes. 
Completed2012
Churchville, Village ofVillage Insulation ProgramMONROEFinger Lakes
$15,635.60
13
The village weatherized  homes, saving approximately $200 per home.  
Completed2012
Clinton CSDClinton Central School DistrictONEIDAMohawk Valley
$3,750,552.36
875
The installation of energy efficient lighting, HVAC upgrades, electric motor replacements, boiler replacements and hot water heater systems. 
Completed2012
Corinth CSDCorinth Central School DistrictSARATOGACentral
$3,003,457.94
603
Controls upgrades, boiler replacement, installation of a solar PV system, lighting upgrade, installation of occupancy and daylight sensors, installation of vending machine misers (equivalent of occupancy sensors) and weatherization. 
In Development2013
CORINTH CSDCorinth Central School DistrictSARATOGACentral
$3,003,457.94
603
Controls upgrades, boiler replacement,   installation of a solar PV system, lighting upgrade, installation of occupancy   and daylight sensors, installation of vending machine misers.
In Progress2014
Cortland, County ofCortland CountyCORTLANDCentral New York
$1,695,244.52
267
Boiler replacements, chiller replacement and energy management system upgrades at the county office building and courthouse. 
Completed2012
Endicott, VIllage ofVillage Insulation ProgramBROOMESouthern Tier
$32,620.00
27
Customer-implemented program with the Village of Endicott Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 14 residents' homes. 
Completed2012
Fairport, Village ofVillage Insulation ProgramMONROEFinger Lakes
$296,200.00
243
The installation of energy efficient insulation in 131 residents' homes.
Completed2012
Fonda Fultonville CSDFonda-Fultonville Central School DistrictMONTGOMERYCentral
$1,144,098.88
416
Installation of energy efficient lighting, lighting controls, a pool cover, and 80 kW photovoltaic installation. 
In Development2013
FONDA FULTONVILLE CSDFonda-Fultonville Central School DistrictMONTGOMERYCentral
$1,144,098.88
416
New energy efficient lighting, lighting   controls, a pool cover, and 80 kW photovoltaic   installation. 
In Development2014
Greenburgh, Town ofTown of Greenburgh - Street Lighting Study (ARRA Funded)WESTCHESTERSoutheastern
$155,792.00
7
Evaluation LED technology as it relates to roadway lighting: identify three locations with   different profiles, develop lighting models using LED fixtures.
In Progress2013
GREENBURGH, TOWN OFTown of Greenburgh - Street Lighting Study (ARRA Funded)WESTCHESTERSoutheastern
$155,792.00
7
Study to evaluate LED technology as it relates to roadway   lighting: evaluate current street lighting, identify three locations with   different profiles, develop lighting models using LED fixtures.
2013
Groton, Village ofVillage Insulation  ProgramTOMPKINSSouthern Tier
$80,612.00
66
Customer-implemented program with the Village of Groton Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in two residents' homes. 
Completed2012
Hamilton, Village ofVillage Insulation ProgramMADISONCentral New York
$114,731.00
94
Customer-implemented program with the Village of Hamilton System. Customer partnered with the IEEP for the installation of energy efficient insulation in residents' homes. 
Completed2012
Irvington UFSDPOCR Solar PV - Irvington School DistrictWESTCHESTERSoutheastern
$75,000.00
4
Installation of 6kW solar photovoltaic system, Irvington High School/Middle School
Completed2013
IRVINGTON UFSDPOCR Solar PV - Irvington School DistrictWESTCHESTERSoutheastern
$75,000.00
4
Installation of a 6kW solar photovoltaic system.    Irvington High School/Middle School, 40 North Broadway, Irvington, NY 10533
2013
Islip, Town ofTown of Islip - East Street Lighting UpgradeSUFFOLKSoutheastern
$2,406,618.98
1,128
Replacement of high pressure sodium, low pressure sodium and metal halide street lighting with more energy efficient induction based lighting technology.  
In Progress2013
Islip, Town ofTown of Islip - LED Traffic Signals & Bldg ECMsSUFFOLKSoutheastern
$1,915,156.85
1,236
LED traffic signal upgrades, high efficiency lighting and occupancy sensor upgrades, upgrade boiler burners, energy management and control system upgrades, HVAC upgrades at 11 town facilities.
In Progress2013
Islip, Town ofTown of Islip - High Efficiency Street LightingSUFFOLKSoutheastern
$3,718,575.59
1,341
Replacement of high pressure sodium, low pressure sodium and metal halide street lighting with more energy efficient induction based lighting technology.  
In Progress2013
ISLIP, TOWN OFTown of Islip - LED Traffic Signals & Bldg ECMsSUFFOLKSoutheastern
$1,915,156.85
1,236
LED traffic signal upgrades, high   efficiency lighting and occupancy sensor upgrades, upgrade boiler burners,   energy management and control system upgrades, HVAC upgrades at 11 Town of Islip   facilities.  
2014
ISLIP, TOWN OFTown of Islip - East Street Lighting UpgradeSUFFOLKSoutheastern
$2,406,618.98
1,128
Replace high pressure   sodium, low pressure sodium and metal halide street lighting with more energy   efficient induction based lighting technology.  
In Progress2014
ISLIP, TOWN OFTown of Islip - High Efficiency Street LightingSUFFOLKSoutheastern
$3,718,575.59
1,341
Replace high pressure sodium, low pressure   sodium and metal halide street lighting with more energy efficient induction   based lighting technology.  
In Progress2014
Lake Placid, Village ofVillage Insulation ProgramESSEXNorth Country
$275,579.00
226
Customer-implemented program with the Village of Lake Placid, Inc. Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 121 residents' homes.
Completed2012Photos
LOCKPORT, CITY OFCity of Lockport - Lighting & HVACNIAGARAWestern
$222,946.17
88
 Installation of  energy efficient lighting and the conversion of the domestic hot water heater from electric o a more efficient equipment using natural gas. 
In Progress2014
Mayville, Village ofVillage Insulation  ProgramCHAUTAUQUAWestern New York
$47,776.00
39
Customer-implemented program with the Village of Mayville Electric System. Customer partnered with the IEEP for the installation of energy efficient insulation in 21 residents' homes. 
Completed2012
Metropolitan Transportation Authority (MTA)Metro North - North White Plains - Ph.II LightingWESTCHESTERMid-Hudson
$585,952.65
351
Upgrade of lighting system and installation of a new electric compressor. 
Completed2012
Metropolitan Transportation Authority (MTA)Metro North - Grand Central Terminal - Ph.INEW YORKNew York City
$1,512,868.00
796
Phase I: Upgrade of lighting, replacement of motors, air compressors and installation of advanced metering. 
Completed2012Photos
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Jerome Maintenance Yard - Compressor UpgradeBRONXNew York City
$74,804.47
51
Upgrade of compressed air system in building. 
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Jamaica Train Yard - HVAC and WindowsQUEENSNew York City
$318,626.05
62
Installation of roof top central HVAC (heat pump system) and duct work, and replacement of inefficient windows with double-pane energy efficient windows.
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Maspeth Warehouse Lighting & Occupancy Sensor ProjectQUEENSNew York City
$248,757.27
239
Upgrade of lighting and installation of occupancy sensors in the building. 
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Pelham Yard - Solar Thermal Hot WaterBRONXNew York City
$230,733.93
30
Installation of boiler controls and more efficient domestic water heater.
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - 207th Street Train Yard - LightingNEW YORKNew York City
$618,718.35
591
Upgrade of lighting system.
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Coney Island Yard - Wheel/Axle and Motor Shop LightingKINGSNew York City
$159,519.07
193
Installation of energy efficient lighting.
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Tunnel Series LED Lighting - Ph.INEW YORKNew York City
$417,823.00
405
The replacement of existing 35-watt incandescent series lamps powered on 600V AC or DC with 10-watt LED Series bulbs. Approximately 5,000 units will be replaced in Phase I. 
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Tunnel Series LED Lighting - Ph. IINEW YORKNew York City
$1,300,722.00
1,168
The replacement of existing white and blue Panasonic 22-watt CFLs located along subway tunnel walls with a 10-watt LED bulb and replacement of existing 36-watt white and approximately 13 blue incandescent bulbs located in subway tunnel interior.  
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - 3rd Rail Heater Wireless Controls - Ph.IIKINGSNew York City
$2,552,081.00
3,498
The installation of wireless RF controls to monitor, control third rail heating elements.  
Completed2012
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Queens Village Bus Depot - LightingQUEENSSoutheastern
$277,124.00
251
Replacement of HID with T5HO fixtures in maintenance and parking areas. 
Completed2013
Metropolitan Transportation Authority (MTA)Long  Island Rail Road (LIRR) - Jamaica Headquarters Building - ASHRAE AuditQUEENSSoutheastern
$100,000.00
0
Energy Audit for entire building including  HVAC, heating plant, roof, windows, and lighting. 
In Progress2013
Metropolitan Transportation Authority (MTA)Long Island Rail Road (LIRR) - HVAC Upgrade Phase 2 - MTW ShopQUEENSSoutheastern
$10,658,238.00
2,431
Replacement of HVAC units and exhaust fans on the roof of the LIRR Hillside Maintenance Facility. Approximately 59 HVAC units will be replaced with 40 new, high efficiency units and approximately 107 exhaust fans will be replaced with 71 new, high efficiency units. 
In Progress2013
Metropolitan Transportation Authority (MTA)Metro North - Grand Central Terminal - Ph.IINEW YORKSoutheastern
$21,934,891.24
11,275
Phase II: Pumps/ VFDs, BMS upgrade / AHUS, steam system repairs, air compressors, chiller plant replacement, cooling tower controls, metering    
In Progress2013
Metropolitan Transportation Authority (MTA)Metro North - Mt. Vernon Station - Electric Infrastructure for Regenerative BrakingWESTCHESTERSoutheastern
$42,894,929.00
9,201
Installation of metering equipment and electric service improvements for Metro North Railroad to take advantage of regenerative braking at their Mount Vernon Bridge 23 Substation. Regenerative braking enables  energy normally wasted during the braking process to be fed back into the   electric supply system.
In Progress2013
Metropolitan Transportation Authority (MTA)Metro North - Grand Central Terminal - Standby GeneratorsNEW YORKSoutheastern
$16,915,985.00
0
Installation of two 2,000KW standby generators for Grand Central Terminal, associated fuel storage tank, paralleling switchgear, distribution relays and controls, load banks, power transformers, and connection into existing SCADA system. 
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Flatbush Bus Depot Compressed Air System Replacement ProjectKINGSSoutheastern
$414,279.23
113
Compressed Air System Replacement    
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Central Station Battery Energy Storage System - CINEW YORKSoutheastern
$175,282.00
0
Installation of an advanced battery system and monitoring equipment at a central sub-station in Manhattan.
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Castleton Bus Depot Compressed Air System UpgradeRICHMONDSoutheastern
$238,854.51
91
Compressed air system upgrade 
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Coney Island Yard - Boiler ReplacementKINGSSoutheastern
$5,447,665.50
1,547
Replace central boiler plant with energy efficient  boiler. 
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Banker LightsNEW YORKSoutheastern
$3,069,794.00
2,412
Relpacement of existing incandescent banker lamp utilizing 5x 75-watt bulbs (or a total of 375-watts) with a new 85 watt LED banker lamp; approximately  4000 units will be replaced. 
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Rail Car Oil-Less CompressorKINGSSoutheastern
$16,506,835.00
2,720
Furnish and deliver energy efficient oil-less air compressors for MTA R46 and R68 rail cars, to replace the existing compressors.  
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Gun Hill Bus Depot - LightingBRONXSoutheastern
$475,924.00
318
Installation of energy efficient lighting.
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Site I-Hydraulic Compressed Air System UpgradeNEW YORKSoutheastern
$569,208.71
419
Upgrade the existing compressed air systems with energy  efficient compressed air system with controls. 
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Pitkin and Jamaica Maintenance Shop Radiant Heating SystemQUEENSSoutheastern
$2,747,752.59
1,511
Installation of infrared heating system at Pitkin and Jamaica Maintenance Shop. 
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Subway Signal Compressor, Ph.2 - Group 2NEW YORKSoutheastern
$5,130,394.10
4,195
Installation of energy efficient air compressors for subway systems.
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - 3rd Rail Heater Wireless Controls - Ph.IKINGSSoutheastern
$4,862,287.00
6,606
Install RF controls to remotely track and monitor 3rd rail heaters from a central location.
In Progress2013
Metropolitan Transportation Authority (MTA)New York City Transit (NYCT) - Atlantic Ave. Cable Section Bldg - LightingKINGSSoutheastern
$144,674.00
67
Lighting upgrade. 
In Progress2013
Metropolitan Transportation Authority (MTA)TBTA - Robert Moses Bldg. Lighting UpgradesNEW YORKSoutheastern
$140,965.07
72
Lighting and Occupancy Sensor Upgrade 
In Development2013
Metropolitan Transportation Authority (MTA)NYCT - Atlantic Ave Cable Section Bldg. - WindowsKINGSSoutheastern
$76,426.83
38
Replacement of windows with energy efficient windows. 
In Development2013
Metropolitan Transportation Authority (MTA)NYCT - 3rd Rail Heater Wireless Controls - Ph.IIINEW YORKSoutheastern
$2,500,000.00
3,868
Install wireless control network to remotely activate 3rd rail heaters from a central location.
In Development2013
Metropolitan Transportation Authority (MTA)NYCT - Jackie Gleason Bus Depot Solar Thermal ProjectKINGSSoutheastern
$223,914.08
511
Installation of solar thermal hot water system 
In Development2013
Metropolitan Transportation Authority (MTA)NYCT - Linden Maintenance Shop ComprehensiveKINGSSoutheastern
$715,491.00
274
Upgrade lighting, lighting controls, and compressed  air system 
In Development2013
Metropolitan Transportation Authority (MTA)NYCT - Tunnel Series LED Lighting - Ph.IIINEW YORKSoutheastern
$640,000.00
0
Supplying blue and white LED lights to replace existing CFL and incandescent bulbs used in the subway tunnels. 
In Development2013
Metropolitan Transportation Authority (MTA)NYCT - Bus Depot - Rapid Roll Up Door Installation at Multiple Bus DepotsMULTIPLEMultiple
$993,120.00
359
Installation of rapid roll up doors at multiple bus depots. 
In Development2013
Metropolitan Transportation Authority (MTA)NYCT - Queens Village Bus Depot - LightingQUEENSSoutheastern
$242,848.89
251
Replace HID fixtures with T5HO fixtures in the maintenance and parking   areas. 
2013
Metropolitan Transportation Authority (MTA)NYCT - 3rd Rail Heater Wireless Controls - Ph.IKINGSSoutheastern
$4,726,006.60
6,554
Phase I: install a wireless   control network to remotely activate 3rd rail heaters from a central   location (38th Street Yard - Brooklyn).
2013
Metropolitan Transportation Authority (MTA)NYCT - Flatbush Bus Depot Compressed Air System Replacement ProjectKINGSSoutheastern
$385,631.49
112
  NYCT   Flatbush Bus Depot Compressed Air System Replacement   Project 
2013
Metropolitan Transportation Authority (MTA)NYCT - Rail Car Oil-Less CompressorKINGSSoutheastern
$16,459,980.11
2,720
Furnish and deliver energy efficient oil-less air   compressors for MTA R46 and R68 rail cars, to replace the existing compressors   which have become inadequate for the application. This project is materials  only, MTA will install the equipment.
2013
Metropolitan Transportation Authority (MTA)NYCT - Gun Hill Bus Depot - LightingBRONXSoutheastern
$442,553.40
356
Installation of energy efficient lighting at Gun Hill Bus Depot.
2013
Metropolitan Transportation Authority (MTA)LIRR - HVAC Upgrade Phase 2 - MTW ShopQUEENSSoutheastern
$10,658,238.00
2,431
Replacement HVAC units and exhaust fans on the   Motor/Truck/Wheel Shop roof of the LIRR Hillside Maintenance Facility.   Approximately 59 HVAC units will be replaced with 40 new, high efficiency units.
2013
Metropolitan Transportation Authority (MTA)NYCT - LED Bank of Lights Phase 1NEW YORKSoutheastern
$2,978,112.80
2,608
Replace existing incandescent banker lamp utilizing   5 x 75watt bulbs (or a total of 375-watts) with a new 85watt LED banker   lamp. Approximately   4000 units will be replaced. 
2013
Metropolitan Transportation Authority (MTA)NYCT - Atlantic Ave Cable Section Bldg - LightingKINGSSoutheastern
$95,826.07
67
Lighting upgrade 
2013
Metropolitan Transportation Authority (MTA)NYCT - Atlantic Ave Cable Section Bldg - WindowsKINGSSoutheastern
$75,873.09
38
Replace windows with energy efficient windows. 
2013
Metropolitan Transportation Authority (MTA)TBTA - Robert Moses Bldg Lighting UpgradesNEW YORKSoutheastern
$140,965.07
72
Lighting and Occupancy Sensor Upgrade 
2013
Metropolitan Transportation Authority (MTA)NYCT - Linden Maintenance Shop ComprehensiveKINGSSoutheastern
$715,491.00
274
Upgrade Lighting, lighting controls, and compressed   air system 
2014
Metropolitan Transportation Authority (MTA)Metro North - Grand Central Terminal - Standby GeneratorsNEW YORKSoutheastern
$19,123,463.28
0
Install two 2,000KW standby generators for Grand Central   Terminal, associated fuel storage tank, paralleling switchgear, distribution   switchgear, relays and controls, load banks, power transformers, and connection   into existing SCADA system.
In Progress2014
Metropolitan Transportation Authority (MTA)Metro North - Grand Central Terminal - Ph.IINEW YORKSoutheastern
$24,821,024.87
11,275
Phase II: Pumps/ VFDs, BMS upgrade / AHUS, steam system repairs, air   compressors, chiller plant replacement, cooling tower controls, metering.   Additional scope added: new cooling towers. 
In Progress2014
Metropolitan Transportation Authority (MTA)Metro North - Mt. Vernon Station - Electric Infrastructure for Regenerative BrakingWESTCHESTERSoutheastern
$42,894,929.00
9,201
Installation of metering equipment and electric service   improvements to allow Metro North Railroad to take advantage of regenerative   braking at their Mount Vernon Bridge 23 Substation. Regenerative braking enables   energy normally wasted duri
In Progress2014
Metropolitan Transportation Authority (MTA)Metro North - North White Plains Yard HVAC UpgradeWESTCHESTERSoutheastern
$2,185,973.82
1,279
Install new high efficiencyHVAC, boilers, install   BMS system, install VFD motors with control valves, new programmable   thermostats, install new steam traps, balance VAVs. 
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - Central Station Battery Energy Storage System - CINEW YORKSoutheastern
$175,282.00
0
Installation of  an advanced battery   system and monitoring equipment at a central sub-station in Manhattan.Benefits   include stabilize the third   rail voltage, collect regenerative   energy during the special testing using an R160 train, pro
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - Coney Island Yard - Boiler ReplacementKINGSSoutheastern
$5,447,665.50
1,547
Replace central boiler plant with energy efficient   boiler. 
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - Jamaica Maintenance Shop Radiant Heating SystemQUEENSSoutheastern
$1,704,387.30
1,023
Installation of infrared heating system at Jamaica Maintenance Shop.NOTE: Pitkin Yard was removed from the scope of work due to roof issues at the facility.
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - 3rd Rail Heater Wireless Controls - Ph.IIINEW YORKSoutheastern
$2,837,971.00
3,557
Phase III: install a wireless   control network to remotely activate 3rd rail heaters from a central   location (38th Street Yard - Brooklyn). The operational state and   status (such as current, voltage, on/off, radio strength, etc.) of rail heat
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - Tunnel Series LED Lighting - Ph.IIINEW YORKSoutheastern
$899,607.43
1,058
Scope   of work includes supplying blue and white LED lights to replace existing   CFL and incandescent bulbs used in the subway tunnels. 
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - Jackie Gleason Bus Depot Solar Thermal ProjectKINGSSoutheastern
$242,319.36
90
Install solar thermal hot water system
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - Subway Signal Compressor, Ph.2 - Group 2NEW YORKSoutheastern
$5,130,394.10
4,195
Installation of energy efficient air compressors for subway systems.
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - Site I-Hydraulic Compressed Air System UpgradeNEW YORKSoutheastern
$569,208.71
419
Upgrade the existing compressed air systems with energy   efficient compressed air system with controls. 
In Progress2014
Metropolitan Transportation Authority (MTA)NYCT - Castleton Bus Depot Compressed Air System UpgradeRICHMONDSoutheastern
$238,854.51
91
Compressed air system upgrade 
In Progress2014
Metropolitan Transportation Authority (MTA)MTA - Executive Order 88 Audits & RCx, Ph.1MULTIPLEMultiple
$904,176.00
0
Perform Energy Audits & Retro-Commissioning for the   Metropolitan Transportation Authority to meet the goals of Executive Order 88.   The Energy Audits will be comprehensive in nature and   will be equivalent to an ASHRAE Level II audit. The sc
In Progress2014
Metropolitan Transportation Authority (MTA)TBTA - Robert F. Kennedy Bridge (Triborough Bridge)NEW YORKSoutheastern
$100,981.76
77
Energy efficient lighting upgrade  
In Development2014
Metropolitan Transportation Authority (MTA)NYCT - Central Electronics Shop Comprehensive ProjectQUEENSSoutheastern
$313,150.40
192
Upgrade lighting and HVAC system in   the building 
In Development2014
Metropolitan Transportation Authority (MTA)NYCT - LED Bank of Lights Phase 2NEW YORKSoutheastern
$4,016,080.00
1,902
Replace incandescant bank of lights with LED bank of   lights 
In Development2014
Metropolitan Transportation Authority (MTA)NYCT - Bus Depot - Rapid Roll Up Door Installation at Multiple Bus DepotsMULTIPLEMultiple
$1,412,583.01
494
Installation of rapid roll up doors at multiple Bus   Depots 
In Development2014
Metropolitan Transportation Authority (MTA)NYCT - Pelham Diesel ShopBRONXSoutheastern
$835,579.46
264
 Pelham Diesel Shop (PDS) is a separate shop within the NYCT Pelham Maintenance Yard.  ECMs to be included in the PDS are: Lighting upgrade; Heating & Ventilation Upgrade.
In Development2014
Monroe, County ofMonroe County Mill Seat Landfill Gas Generation Ph.III - CIMONROECentral
$10,009,674.64
12,967
Installation of four new Caterpillar 3516 Generator Sets rated at 800KW each and all associated equipment.  
In Progress2013